Claim at v1.2.0
stalled-flood-zone-starts
879aed2187605040e95d8d8ae102eafb80ec33ff94dc68b8494a0bf766188495
Data
{
"has_outcome": true,
"kind": "confirmation",
"lineage": {
"audit": "docs/lineage_audit.md; data/derived/lineage_audit.json",
"class": "c",
"class_meaning": "a shared cache: the query was fetched for an earlier claim and holds this claim's outcome",
"classes": [
"c",
"a"
],
"early_sources": [
{
"class": "a",
"dataset": "ipu4-2q9a",
"evidence": "Legacy NB permits define the jobs and foundation start dates (the cohort), cached from the construction round. Not the outcome.",
"fetched": "2026-11-12T15:26:51-05:00",
"name": "DOB Permit Issuance"
},
{
"class": "a",
"dataset": "rbx6-tga4",
"evidence": "DOB NOW foundation permits define the start date and window (exposure), fetched at 11:54:48 for this claim. Not the outcome.",
"fetched": "2026-11-13T11:54:48-05:00",
"name": "DOB NOW: Build – Approved Permits"
},
{
"class": "a",
"dataset": "w9ak-ipjd",
"evidence": "DOB NOW job filings define New Building jobs (the cohort). Not the outcome.",
"fetched": "2026-11-12T15:21:36-05:00",
"name": "DOB NOW: Build – Job Application Filings"
},
{
"class": "c",
"dataset": "bs8b-p36w",
"earlier_claim": "stalled-421a-vesting-footings",
"evidence": "Legacy certificates of occupancy (outcome). Referee: the outcome measure \"was written at 11:56:30, after the registrant had seen the job-level outcomes of stalled-421a-vesting-footings\"; \"The PLUTO flood flags had not been fetched at that time\".",
"fetched": "2026-11-12T15:20:43-05:00",
"name": "DOB Certificate Of Occupancy",
"revealed_deciding_number": "no: the no-CO status of every job and its borough was seen, but not by floodplain, so the deciding difference was not"
},
{
"class": "c",
"dataset": "pkdm-hqz6",
"earlier_claim": "stalled-421a-vesting-footings",
"evidence": "DOB NOW certificates of occupancy (outcome); as for bs8b-p36w.",
"fetched": "2026-11-12T15:21:05-05:00",
"name": "DOB NOW: Certificate of Occupancy",
"revealed_deciding_number": "no: as for bs8b-p36w"
},
{
"class": "a",
"dataset": "64uk-42ks",
"evidence": "PLUTO floodplain flags (pfirm15_flag) are the exposure, fetched 11:57:46 for this claim.",
"fetched": "2026-11-13T11:57:46-05:00",
"name": "Primary Land Use Tax Lot Output (PLUTO)"
}
]
},
"outcome": "stalled-flood-zone-starts",
"prereg_branch": {
"name": "prereg/stalled-flood-zone-starts",
"sha": "fc819e57bae93f53cc3bb1f65682af895a4a4512"
},
"prior": 0.35,
"registered_at": "2026-11-13T11:59:11-0500",
"registrant": "claude-opus (stalled-construction agent), 13 Nov 2026",
"registration": {
"alternatives": [
"Neighbourhood market: floodplain lots in Queens and Brooklyn are in Rockaway, Coney Island, Red Hook and Gowanus, where demand differs (borough stratification only partly removes it)",
"Project size: large waterfront projects take longer than 36 months whether or not flood rules slow them",
"The current PLUTO flag describes the lot today; lot changes after the permit can misplace a job",
"Selection: the flood rules may deter weak projects before foundation, leaving stronger ones (biases toward no difference)"
],
"graph_evidence": [
{
"concepts": [
"vacant lots"
],
"direction": "n/a",
"n_findings": null,
"n_studies": null,
"pubmed_ids": [
"23814668",
"36716893"
],
"summary": "The graph has no finding on flood rules and construction duration. Its vacant-land findings (PMIDs 23814668, 36716893) concern the consequence of land left vacant. The repo's tidal-flooding claims (further-tidal-flooding-*) concern flooding, not building."
}
],
"id": "stalled-flood-zone-starts",
"kind": "confirmation",
"literature": [
{
"citation": "NYC Building Code Appendix G (flood-resistant construction), amended 2013 after Hurricane Sandy",
"doi": null,
"finding": "Buildings in the 1% floodplain must elevate or flood-proof to the design flood elevation plus freeboard, adding design review and cost."
},
{
"citation": "NYC DCP, Zoning for Coastal Flood Resiliency (2021)",
"doi": null,
"finding": "Text amendment allowing height to be measured from the flood elevation; framed as removing a zoning obstacle to building in the floodplain."
},
{
"citation": "FEMA preliminary FIRM 2015 for NYC (used for building code since 2015)",
"doi": null,
"finding": "The 2015 preliminary maps enlarged the 1% floodplain; Red Hook lies wholly within it."
}
],
"plan": "Script analyses/stalled/flood_predictor.py, mode 'run', committed with this registration. 3,410 foundation starts in the windows 15 Dec-14 Jun of 2017-2023 (from vesting_cohorts.py); 3,276 match current PLUTO, 401 of them in the 2015 preliminary floodplain (BK 121, BX 19, MN 30, QN 198, SI 33). Outcome stalled_1096 from vesting_exploratory.py (no CO by job number or BBL within 1,096 days). Bootstrap 2,000 draws, seed 20261113, within borough x flood strata. Power check (rule 8): with a rate near 0.38 the standard error is about 0.026, so a true difference of 0.10 gives z_null about 3.9 (D = 15); the test discriminates for differences above about 0.055.",
"prediction": {
"direction": "+",
"magnitude": "Mantel-Haenszel borough-stratified risk difference, flood minus non-flood, of the 36-month no-CO rate: +0.04 to +0.15.",
"refute_if": "upper 95% bootstrap bound of the stratified risk difference < 0",
"support_if": "lower 95% bootstrap bound of the stratified risk difference > 0"
},
"prior": 0.35,
"registered_at": "2026-11-13T11:59:11-0500",
"registrant": "claude-opus (stalled-construction agent), 13 Nov 2026",
"sha256": "2904af8de8b282f1b3508d91dcd41b6ea9282ca7792838dc3e718b16b9de0f44",
"statement": "New-building jobs on lots in the 2015 preliminary 1%-annual-chance floodplain fail to reach a certificate of occupancy within 36 months of their first foundation permit more often than jobs elsewhere in the same borough."
},
"registration_commit": {
"commit": "fc819e57bae93f53cc3bb1f65682af895a4a4512",
"committed_at": "2026-11-13T11:59:11-05:00"
},
"registration_file_sha256": "6faf7932b358bc751e403da266e859140706e368de7bfb400ab7a402932b004a",
"registration_path": "claims/registered/stalled-flood-zone-starts.json",
"registration_sha256": "2904af8de8b282f1b3508d91dcd41b6ea9282ca7792838dc3e718b16b9de0f44",
"registration_text": "{\n \"id\": \"stalled-flood-zone-starts\",\n \"kind\": \"confirmation\",\n \"statement\": \"New-building jobs on lots in the 2015 preliminary 1%-annual-chance floodplain fail to reach a certificate of occupancy within 36 months of their first foundation permit more often than jobs elsewhere in the same borough.\",\n \"graph_evidence\": [\n {\n \"concepts\": [\n \"vacant lots\"\n ],\n \"n_findings\": null,\n \"n_studies\": null,\n \"direction\": \"n/a\",\n \"summary\": \"The graph has no finding on flood rules and construction duration. Its vacant-land findings (PMIDs 23814668, 36716893) concern the consequence of land left vacant. The repo's tidal-flooding claims (further-tidal-flooding-*) concern flooding, not building.\",\n \"pubmed_ids\": [\n \"23814668\",\n \"36716893\"\n ]\n }\n ],\n \"literature\": [\n {\n \"citation\": \"NYC Building Code Appendix G (flood-resistant construction), amended 2013 after Hurricane Sandy\",\n \"doi\": null,\n \"finding\": \"Buildings in the 1% floodplain must elevate or flood-proof to the design flood elevation plus freeboard, adding design review and cost.\"\n },\n {\n \"citation\": \"NYC DCP, Zoning for Coastal Flood Resiliency (2021)\",\n \"doi\": null,\n \"finding\": \"Text amendment allowing height to be measured from the flood elevation; framed as removing a zoning obstacle to building in the floodplain.\"\n },\n {\n \"citation\": \"FEMA preliminary FIRM 2015 for NYC (used for building code since 2015)\",\n \"doi\": null,\n \"finding\": \"The 2015 preliminary maps enlarged the 1% floodplain; Red Hook lies wholly within it.\"\n }\n ],\n \"prediction\": {\n \"direction\": \"+\",\n \"magnitude\": \"Mantel-Haenszel borough-stratified risk difference, flood minus non-flood, of the 36-month no-CO rate: +0.04 to +0.15.\",\n \"support_if\": \"lower 95% bootstrap bound of the stratified risk difference > 0\",\n \"refute_if\": \"upper 95% bootstrap bound of the stratified risk difference < 0\"\n },\n \"plan\": \"Script analyses/stalled/flood_predictor.py, mode 'run', committed with this registration. 3,410 foundation starts in the windows 15 Dec-14 Jun of 2017-2023 (from vesting_cohorts.py); 3,276 match current PLUTO, 401 of them in the 2015 preliminary floodplain (BK 121, BX 19, MN 30, QN 198, SI 33). Outcome stalled_1096 from vesting_exploratory.py (no CO by job number or BBL within 1,096 days). Bootstrap 2,000 draws, seed 20261113, within borough x flood strata. Power check (rule 8): with a rate near 0.38 the standard error is about 0.026, so a true difference of 0.10 gives z_null about 3.9 (D = 15); the test discriminates for differences above about 0.055.\",\n \"alternatives\": [\n \"Neighbourhood market: floodplain lots in Queens and Brooklyn are in Rockaway, Coney Island, Red Hook and Gowanus, where demand differs (borough stratification only partly removes it)\",\n \"Project size: large waterfront projects take longer than 36 months whether or not flood rules slow them\",\n \"The current PLUTO flag describes the lot today; lot changes after the permit can misplace a job\",\n \"Selection: the flood rules may deter weak projects before foundation, leaving stronger ones (biases toward no difference)\"\n ],\n \"prior\": 0.35,\n \"registrant\": \"claude-opus (stalled-construction agent), 13 Nov 2026\",\n \"registered_at\": \"2026-11-13T11:59:11-0500\",\n \"sha256\": \"2904af8de8b282f1b3508d91dcd41b6ea9282ca7792838dc3e718b16b9de0f44\"\n}",
"statement": "New-building jobs on lots in the 2015 preliminary 1%-annual-chance floodplain fail to reach a certificate of occupancy within 36 months of their first foundation permit more often than jobs elsewhere in the same borough."
}History in this collection